Follow us on LinkedIn
Home
Technical specifications
HSEQ and Certifications
Product program
User Manual
Our Company
About us
Verton lifting gear
Agencies
Terms
Contact
How to find us
People
Media and News
Gallery
Load Out in Aberdeen
News
References
Profile brochure
Select Page
Cookies
×
50%
Less handling
on the rig
All preparations are done onshore.
No need for crane onshore during packing and loading / unloading trucks.
No more laying out pipes offshore.
Reduced damages to threads
Less handling = less risk, and better safety
×
60%
Less space
used on the rig
Your Rig-Ready pipes can be placed directly on the cantilever deck on one lift from the boat ready to run in hole.
Space optimisation with TubeLock
®
TTRS minimises the entire footprint of tubular handling. More pipes on less space!
More space = Opportunities for more activities
×
18%
Less time
on the entire process
Pipes are prepped at the pipe yard tallying, drifted and fitting with centralisers (if required) is done prior to load out.
Offshore you will save valuable time and handling pipe.
Time = Money
×
×
×
×
×
×
×