Today we tested if we could safely transport 5-1/2” sand-screens in TubeLock TTRS. The test, including a 12 Tonnes proof load test, was successful and proved no bending and no damage to the sand-screens.
50% Less handling
on the rig
All preparations are done onshore.
No need for crane onshore during packing and loading / unloading trucks. No more laying out pipes offshore.
Reduced damages to threads
Less handling = less risk, and better safety
60% Less space
used on the rig
Your Rig-Ready pipes can be placed directly on the cantilever deck on one lift from the boat ready to run in hole.
Space optimisation with TubeLock® TTRS minimises the entire footprint of tubular handling. More pipes on less space!
More space = Opportunities for more activities
18% Less time
on the entire process
Pipes are prepped at the pipe yard tallying, drifted and fitting with centralisers (if required) is done prior to load out.
Offshore you will save valuable time and handling pipe.